Completed Projects – September 2016

14089144_1772451516337249_1146968537687122527_n 14199533_1772451866337214_4497668938989637960_n

Tested and ready for concrete

14203169_1772454866336914_6000883257690488448_n 14211927_1772451406337260_4648702235355739425_n 14212802_1772452023003865_5882868646074366139_n

24″ Linestop on steel

14232619_1772454703003597_7647411758831284058_n

Final build checks of the Powervalve avaliable 16″ through 36″. Ready for client.14233161_1772456703003397_525870306847622551_n

Inserter valve 12″. Installation with out disruption14237504_1772455979670136_5084856576109025341_n 14317418_1772448213004246_3080967921249118139_n

Needed a new 7″ articulated head as an emergency because our 6 other heads were on jobs. We fabricated this one in 7 hours. This can be done being a true one stop shop for the industry having our own machine shop and fabrication shop allows us to do what others only pretend they can do.14333051_1774838356098565_3485212225082419407_n

Another 800mm drilling done14358880_1778614819054252_8261338976140741093_n

Final checks for divers.

14370010_1778620885720312_4480762202424372604_n

One side of double 18″. Heads in and repair underway.14440753_1781373002111767_1079030428515569214_n 14440834_1778614889054245_32418634205519843_n 14457533_1778615075720893_167118448437402309_n

Very tight tee installation carried out under short shutdown window. This project was on a very critical main and has taken over 2 years from having the order to being able to complete phase 1. Next visit to under pressure tie in to next main. All calculations and fabrication completed by PTS.14462745_1778620002387067_4178855841155633077_n

Section of 36″ main being remove to allow cap end to be fitted. PTS designed cap end to allow driver to be able to fit in zero visibility conditions after pit floods and levels out to canal level.14462750_1778620805720320_2528252247984106811_n 14462756_1778614949054239_2011548499731734418_n